SherbornTank Install, Tank Removal The team removed (2 ) 500-gallon tanks as well as repiping of manhole cover piping. The team installed (2) 330-gallon tanks, repiped, and re-did oil lines, according to State and Federal codes. The inspection was done by Supervisor, the checklist was complete. https://oilremovalpro.com/wp-content/uploads/2023/06/sherborn-2.webp 900 1200 competenow http://oilremovalpro.com/wp-content/uploads/2023/02/logo-removal-pro.png competenow2023-06-14 16:36:382023-07-24 15:26:58Sherborn
NewtonTank Install, Tank Removal The team removed cut and cleaned a 275 Granby tank. The Team also installed a new tank and brought any oil lines and pipes up to state and federal codes. As always a lead tech did an inspection and checklist of removal and installation. https://oilremovalpro.com/wp-content/uploads/2023/06/newton-4.webp 1600 1200 competenow http://oilremovalpro.com/wp-content/uploads/2023/02/logo-removal-pro.png competenow2023-06-14 16:30:472023-06-14 16:38:01Newton